In the words of Antonio Penalva, "is not a trivial or unimportant problem, since this would often delay the arrival of emergency teams to our town in three minutes what can be assumed in cases of extreme urgency too late, and keep in mind that Cieza accounts for almost 70 percent of their actions "
Remember the mayor of IU-Greens Cieza that "firefighters Cieza, are prohibited from turning left at the exit of the fire station in joining the N-301, having to move far until the roundabout more what keeps them coming municipality or other sites in the area in which his performance is required, which adds extra minutes late in their operations. "
This, accurate Penalva, "has been sent by the Fire Station de Cieza both the Consortium for Fire Fighting and Rescue Region of Murcia as the government team of the City of Cieza team, asking for a solution that There, with the utmost urgency "
The Ministry of Public Works has answered "that while the application is discussed in view of the possible implementation of a gazebo in that section, it is reiterated that 'for reasons of road safety' is necessary to prevent turning left at that point and make the turn at the PK 375 + 700 bower Ctra. N-301 ".
And from the Mayor of the City of Cieza has told them that "understanding, therefore, that the competent body has responded and announced his determination, has not place a reiteration of the request by the City Council"
For IU-Green, "the problem is not solved by waiting for the Ministry of Development to build the roundabout just at the point of incorporation, because this action, in the best case and if the formalities quickly are made, soon enough time, a solution that can be implemented as soon as possible while the roundabout is not built "is required.
And it says Antonio Penalva, "we disagree with the approach taken to this problem by the government team, which can not adopt the tactics of the ostrich, ie burying your head and pretend that the problem no longer exists; the City Cieza must act, pressuring the Ministry of Development to build the roundabout as soon as possible, but also taking appropriate transitional arrangements as soon as possible, to ensure that the movement of fire equipment to the municipality of Cieza, when necessary, achieves its maximum speed and safely as possible. "
Source: IU-verdes Cieza