Portal de Cieza

www.portaldecieza.com

Cieza - SpanishCieza - English
detail of Cieza

 

The Department of Development Crossing Cieza repairs to improving the firm (17/04/2015)

The Minister of Development, Public Works and Planning, Francisco Barnabas, accompanied by the Mayor of Cieza, Antonio Tamayo, today conducted an inspection visit to works that have been performed at the crossing of the town (T-511) within the village, in the section that runs between Bowling Game Street at the intersection with the RM-532 highway, and Avenue Juan Carlos I.

Barnabas explained that "this is a stretch that reaches 560 meters, with an average road width 11.5 meters, which has carried out a steady improvement to repair the deterioration caused not only by the course time but also by the associated traffic intensity ".

The holder of Development said that "because the section that has been repaired is urban, has been used art machinery and respectful of the environment and, in particular, has required an agglomerate having paver levels noise, measured in decibels, extremely low, to interfere as little as possible in everyday life for residents. "

The works carried out, with an economic cost of 43,250 euros, have included the improvement of the surface layer of the firm and resisting section of the road, through the extension of particleboard with an average thickness of two inches.

It has also had to milling of the existing pavement in an adjacent longitudinal band with curbs, to maintain its current height.

Have also been painted horizontal road markings in both axis and lateral.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información